Operation CHARM: Car repair manuals for everyone.

Installation








2UZ-FE INTAKE: VACUUM SWITCHING VALVE (for ACIS):

INSTALLATION

1. INSTALL VACUUM SWITCHING VALVE ASSEMBLY (for ACIS)
(a) Connect the VSV connector.





(b) Install the VSV connector and VSV to the intake manifold with the 2 bolt.
Torque: 7.5 Nm (76 kgf-cm, 66 in-lbf)
(c) Connect the 2 vacuum hoses to the VSV.
2. INSTALL INTAKE MANIFOLD (Installation)

3. INSTALL FUEL MAIN TUBE (Installation)

4. INSTALL FUEL RETURN TUBE (Installation)

5. INSTALL NO. 2 WATER BY-PASS PIPE (Installation)

6. INSTALL NO. 1 BRAKE BOOSTER TUBE (Installation)

7. INSTALL AIR CLEANER HOSE ASSEMBLY (Installation)

8. ADD ENGINE COOLANT (Service and Repair)

9. INSPECT FOR COOLANT LEAK (Testing and Inspection)

10. CHECK FOR FUEL LEAK (Installation)

11. INSTALL NO. 1 ENGINE UNDER COVER (Replacement)

12. INSTALL THROTTLE BODY COVER SUB-ASSEMBLY (Installation)

13. INSTALL FRONT COWL TOP OUTER PANEL SUB-ASSEMBLY (Installation)

14. INSTALL FRONT WIPER MOTOR AND LINK ASSEMBLY (Installation)

15. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTE: Some systems need to be initialized after the cable is reconnected (Repair Instruction - Initialization).