Installation
2UZ-FE STARTING: IGNITION SWITCH:
INSTALLATION
1. INSTALL IGNITION SWITCH ASSEMBLY (Reassembly)
2. INSTALL UPPER STEERING COLUMN WITH SWITCH BRACKET ASSEMBLY (for Manual Tilt) (Reassembly)
3. INSTALL UPPER STEERING COLUMN WITH SWITCH BRACKET ASSEMBLY (for Manual Tilt and Manual Telescopic Steering Column) (Reassembly)
4. INSTALL UPPER STEERING COLUMN WITH SWITCH BRACKET ASSEMBLY (for Power Tilt and Power Telescopic Steering Column) (Reassembly)
5. INSTALL STEERING COLUMN ASSEMBLY
(a) for Manual Tilt:
Install the steering column (Installation).
(b) for Manual Tilt and Telescopic:
Install the steering column (Installation).
(c) for Power Tilt and Power Telescopic:
Install the steering column (Installation).
6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTE: Some systems need to be initialized after the cable is reconnected (Repair Instruction - Initialization).