Operation CHARM: Car repair manuals for everyone.

Installation








DIFFERENTIAL: FRONT DIFFERENTIAL CARRIER ASSEMBLY (for 4WD): INSTALLATION

INSTALLATION

1. INSTALL FRONT DIFFERENTIAL CARRIER ASSEMBLY






(a) Install the differential support with the F and G bolts.
Torque: 100 Nm (1019 kgf-cm, 74 ft-lbf)
(b) Using a jack, slowly raise the front differential carrier assembly to its installation position.
(c) Temporarily install the A, B, C, D and E bolts.
(d) Tighten the A bolt.
Torque: 120 Nm (1224 kgf-cm, 89 ft-lbf)
(e) Tighten the B and C bolts.
Torque: 120 Nm (1224 kgf-cm, 89 ft-lbf)
(f) Tighten the D and E bolts.
Torque: 120 Nm (1224 kgf-cm, 89 ft-lbf)
(g) Connect the automatic disconnecting differential actuator hose.
(h) Connect the automatic disconnecting differential actuator connector.
2. INSTALL FRONT DRIVE SHAFT ASSEMBLY LH
(a) Install the front drive shaft Installation.
3. INSTALL FRONT DRIVE SHAFT ASSEMBLY RH
HINT: Use the same procedure as the LH side.

4. INSTALL FRONT PROPELLER SHAFT ASSEMBLY
(a) Install the front propeller shaft (Service and Repair).
5. ADD DIFFERENTIAL OIL (Fluid - Differential).

6. INSTALL NO. 1 ENGINE UNDER COVER
7. INSTALL FRONT WHEEL
(a) Install the front wheels.
for aluminum wheel - Torque: 131 Nm (1336 kgf-cm, 97 ft-lbf)
for steel wheel - Torque: 209 Nm (2131 kgf-cm, 154 ft-lbf)
8. INSPECT AUTOMATIC DISCONNECTING DIFFERENTIAL ACTUATOR
(a) Inspect the automatic disconnecting differential actuator (Component Tests and General Diagnostics).