Installation
HORN: HIGH PITCHED HORN: INSTALLATION
INSTALLATION
1. INSTALL HIGH PITCHED HORN ASSEMBLY
(a) Place the stay onto the baffle part in the radiator support upper, and then install the horn assembly with the bolt.
Torque: 20 Nm (199 kgf-cm, 15 ft-lbf)
(b) Connect the connector.