Operation CHARM: Car repair manuals for everyone.

Power Distribution Relay: Testing and Inspection








1GR-FE STARTING: ACC CUT RELAY: INSPECTION

INSPECTION

1. INSPECT ACC CUT RELAY





(a) Continuity inspection.
(1) Using an ohmmeter, check for continuity between each terminal.
Specified condition:





(2) Using an ohmmeter, check for continuity between terminals 3 and 5 when voltage is applied across terminals 1 and 2.
Specified condition:
Continuity