Power Distribution Relay: Testing and Inspection
1GR-FE STARTING: ACC CUT RELAY: INSPECTION
INSPECTION
1. INSPECT ACC CUT RELAY
(a) Continuity inspection.
(1) Using an ohmmeter, check for continuity between each terminal.
Specified condition:
(2) Using an ohmmeter, check for continuity between terminals 3 and 5 when voltage is applied across terminals 1 and 2.
Specified condition:
Continuity