Removal
2GR-FE ENGINE CONTROL SYSTEM: ACTIVE CONTROL ENGINE MOUNT: REMOVAL
REMOVAL
1. REMOVE V-BANK COVER SUB-ASSEMBLY Removal
2. REMOVE ENGINE UNDER COVER ASSEMBLY Removal
3. REMOVE NO. 1 ENGINE UNDER COVER Removal
4. DRAIN ENGINE COOLANT Service and Repair
5. REMOVE COOL AIR INTAKE DUCT SEAL Removal
6. REMOVE BATTERY Removal
7. REMOVE NO. 2 AIR CLEANER INLET Removal
8. REMOVE NO. 1 AIR CLEANER INLET Removal
9. DISCONNECT NO. 1 RADIATOR HOSE Removal
10. DISCONNECT NO. 2 RADIATOR HOSE Removal
11. DISCONNECT OIL COOLER HOSE Removal
12. DISCONNECT COOLING FAN ECU CONNECTOR Removal
13. REMOVE RADIATOR GRILLE Removal
14. REMOVE HOOD LOCK ASSEMBLY (w/o Engine Hood Courtesy Switch) Removal
15. REMOVE HOOD LOCK ASSEMBLY (w/ Engine Hood Courtesy Switch) Removal
16. REMOVE UPPER RADIATOR SUPPORT SUB-ASSEMBLY Removal
17. SEPARATE COOLER CONDENSER ASSEMBLY Removal
18. REMOVE RADIATOR ASSEMBLY AND FAN ASSEMBLY WITH MOTOR Removal
19. REMOVE TRANSVERSE ENGINE MOUNTING BRACKET
HINT: Securely support the automatic transaxle using a jack.
(a) Remove the nut, 3 bolts and the transverse engine mounting bracket.
20. REMOVE FRONT ENGINE MOUNTING INSULATOR ASSEMBLY
(a) Disconnect the vacuum hose sub-assembly from the air cleaner cap sub-assembly and vacuum switching valve.
(b) Remove the 2 clamps.
(c) Disconnect the duty vacuum switching valve connector and clamp.
(d) Remove the cap, 3 nuts and front engine mounting insulator assembly.