Operation CHARM: Car repair manuals for everyone.

Installation








AIR CONDITIONING: AIR CONDITIONING PANEL: INSTALLATION

INSTALLATION

1. INSTALL AIR CONDITIONING CONTROL ASSEMBLY





(a) Connect the 2 connectors.
(b) Engage the 4 clips and install the air conditioning control assembly.
2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque: 3.9 Nm (40 kgf-cm, 35 in-lbf)
NOTICE: Refer to PRECAUTION Service Precautions.