Operation CHARM: Car repair manuals for everyone.

Installation








1GR-FE ENGINE CONTROL SYSTEM: ECM: INSTALLATION

INSTALLATION

1. INSTALL ECM BRACKET





(a) Install the ECM bracket with the 2 screws.
Torque: 3.0 Nm (32 kgf-cm, 28 in-lbf)
2. INSTALL NO. 2 ECM BRACKET





(a) Install the No. 2 ECM bracket with the 2 screws.
Torque: 3.0 Nm (32 kgf-cm, 28 in-lbf)
3. INSTALL NO. 2 JUNCTION BLOCK





(a) Engage the claw and install the No. 2 junction block.
(b) Install the bolt.
Torque: 8.0 Nm (82 kgf-cm, 71 in-lbf)
4. INSTALL ECM





(a) Install the ECM with the nut and 2 bolts
Torque: 5.0 Nm (51 kgf-cm, 44 in-lbf)





(b) Connect the 6 No. 2 junction block connectors, 6 ECM connectors and wire harness clamp.
5. INSTALL INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY LOWER RH Installation
6. INSTALL GLOVE COMPARTMENT DOOR ASSEMBLY Installation