Operation CHARM: Car repair manuals for everyone.

Installation





HORN: HORN: INSTALLATION

1. INSTALL LOW PITCHED HORN ASSEMBLY (for 2TR-FE)

(a) Install the low pitched horn assembly with the bolt.

Torque : 20 Nm (204 kgf-cm, 15 ft-lbf)

(b) Connect the connector.

2. INSTALL LOW PITCHED HORN ASSEMBLY (for 1GR-FE)

(a) Install the low pitched horn assembly with the bolt.

Torque : 20 Nm (204 kgf-cm, 15 ft-lbf)

(b) Connect the connector.

3. INSTALL RADIATOR GRILLE BRACKET (for 1GR-FE)

(a) Install the radiator grille bracket with the 3 bolts.

4. INSTALL HIGH PITCHED HORN ASSEMBLY (for 1GR-FE)

(a) Install the high pitched horn assembly with the bolt.

Torque : 20 Nm (204 kgf-cm, 15 ft-lbf)

(b) Connect the connector.

5. INSTALL UPPER RADIATOR SUPPORT SEAL Installation