Installation
HORN: HORN: INSTALLATION
1. INSTALL LOW PITCHED HORN ASSEMBLY (for 2TR-FE)
(a) Install the low pitched horn assembly with the bolt.
Torque : 20 Nm (204 kgf-cm, 15 ft-lbf)
(b) Connect the connector.
2. INSTALL LOW PITCHED HORN ASSEMBLY (for 1GR-FE)
(a) Install the low pitched horn assembly with the bolt.
Torque : 20 Nm (204 kgf-cm, 15 ft-lbf)
(b) Connect the connector.
3. INSTALL RADIATOR GRILLE BRACKET (for 1GR-FE)
(a) Install the radiator grille bracket with the 3 bolts.
4. INSTALL HIGH PITCHED HORN ASSEMBLY (for 1GR-FE)
(a) Install the high pitched horn assembly with the bolt.
Torque : 20 Nm (204 kgf-cm, 15 ft-lbf)
(b) Connect the connector.
5. INSTALL UPPER RADIATOR SUPPORT SEAL Installation