Removal
POWER OUTLETS (INT): POWER OUTLET SOCKET (for Front): REMOVAL
1. REMOVE NO. 1 INSTRUMENT CLUSTER FINISH PANEL GARNISH Removal
2. REMOVE NO. 2 INSTRUMENT CLUSTER FINISH PANEL GARNISH Removal
3. REMOVE HEATER CONTROL ASSEMBLY Removal
4. REMOVE SHIFT LEVER KNOB SUB-ASSEMBLY (for 1GR-FE) Removal
5. REMOVE SHIFT LEVER KNOB SUB-ASSEMBLY (for VF2A) Removal
6. REMOVE SHIFT LEVER KNOB SUB-ASSEMBLY (for 2TR-FE) Removal
7. REMOVE UPPER CONSOLE PANEL SUB-ASSEMBLY (for 1GR-FE) Removal
8. REMOVE UPPER CONSOLE PANEL SUB-ASSEMBLY (for 2TR-FE) Removal
9. REMOVE NO. 2 CONSOLE BOX RETAINER Removal
10. REMOVE LOWER CENTER INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY Removal
11. REMOVE POWER POINT SOCKET ASSEMBLY
(a) Using a screwdriver, detach the claw and remove the power point socket.
HINT
Tape the screwdriver tip before use.
Text in Illustration
12. REMOVE POWER POINT SOCKET COVER
(a) Detach the 2 claws and remove the socket cover.