Installation
AIR CONDITIONING: AIR CONDITIONING PANEL: INSTALLATION
1. INSTALL INTEGRATION CONTROL AND PANEL ASSEMBLY
(a) Connect the 3 connectors.
(b) Engage the 4 clips and install the integration control assembly.
(c) Install the 2 screws.
2. INSTALL INSTRUMENT PANEL GARNISH LH Installation
3. INSTALL INSTRUMENT PANEL GARNISH RH Installation
4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque : 3.9 Nm (40 kgf-cm, 35 in-lbf)