Installation
OTHER SYSTEM: VOLTAGE INVERTER: INSTALLATION
1. INSTALL VOLTAGE INVERTER ASSEMBLY
(a) Install the voltage inverter assembly with the 5 bolts.
Torque : 8.5 Nm (87 kgf-cm, 75 in-lbf)
(b) Connect the 2 connectors and install the wire harness clamp.
(c) Install the ground wire with the bolt.
Torque : 6.9 Nm (70 kgf-cm, 61 in-lbf)
2. INSTALL DECK TRIM SIDE PANEL ASSEMBLY RH Installation
3. INSTALL REAR SEAT OUTER BELT ASSEMBLY RH Installation
4. INSTALL LAP BELT OUTER ANCHOR COVER Installation
5. INSTALL QUARTER TRIM POCKET (w/o Amplifier Box Speaker Assembly) Installation
6. INSTALL SIDE TRIM COVER (w/o Amplifier Box Speaker Assembly) Installation
7. INSTALL QUARTER TRIM POCKET TRAY (w/o Amplifier Box Speaker Assembly) Installation
8. INSTALL PACKAGE HOLDER NET HOOK (w/o Amplifier Box Speaker Assembly) Installation
9. INSTALL AMPLIFIER BOX SPEAKER ASSEMBLY (w/ Amplifier Box Speaker Assembly) Installation
10. INSTALL SPEAKER MOUNTING COVER (w/ Amplifier Box Speaker Assembly) Installation
11. INSTALL DECK SIDE GARNISH (w/ Amplifier Box Speaker Assembly) Installation
12. INSTALL REAR DOOR SCUFF PLATE RH Installation
13. INSTALL FRONT DOOR SCUFF PLATE RH Installation
14. INSTALL REAR FLOOR MAT ASSEMBLY Installation
15. INSTALL REAR FLOOR MAT SUPPORT PLATE Installation
16. INSTALL REAR FLOOR BOARD Installation
17. INSTALL REAR SEATBACK ASSEMBLY RH Installation
18. INSTALL REAR SEAT BACK BOARD CARPET ASSEMBLY RH Installation
19. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque : 3.9 Nm (40 kgf-cm, 35 in-lbf)