Installation
METER: LIGHT CONTROL RHEOSTAT: INSTALLATION
1. INSTALL LIGHT CONTROL RHEOSTAT
(a) Engage the 2 claws and install the light control rheostat.
(b) Connect the connector.
2. INSTALL NO. 1 INSTRUMENT PANEL REGISTER ASSEMBLY Installation
3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque : 3.9 Nm (40 kgf-cm, 35 in-lbf)