Installation
HORN: LOW PITCHED HORN: INSTALLATION
1. INSTALL LOW PITCHED HORN ASSEMBLY
(a) Install the low pitched horn with the bolt.
- Torque : 9.8 Nm (100 kgf-cm, 7 ft-lbf)
NOTICE:
Do not place the low pitched horn over the stopper of the body.
(b) Connect the horn connector.
2. INSTALL RADIATOR GRILLE Installation
3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque : 3.9 Nm (40 kgf-cm, 35 in-lbf)