Installation
2GR-FE ENGINE CONTROL SYSTEM: KNOCK SENSOR: INSTALLATION
1. INSTALL KNOCK CONTROL SENSOR
(a) Install the 2 knock control sensors with the 2 bolts as shown in the illustration.
Torque : 20 Nm (204 kgf-cm, 15 ft-lbf)
(b) Connect the 2 knock control sensor connectors.
2. INSTALL INTAKE MANIFOLD Installation
3. INSTALL NO. 2 ENGINE MOUNTING STAY RH Installation
4. CONNECT FUEL MAIN TUBE Installation
5. TEMPORARILY INSTALL NO. 1 SURGE TANK STAY Installation
6. TEMPORARILY INSTALL THROTTLE BODY BRACKET Installation
7. INSTALL INTAKE AIR SURGE TANK ASSEMBLY Installation
8. FULLY TIGHTEN NO. 1 SURGE TANK STAY Installation
9. FULLY TIGHTEN THROTTLE BODY BRACKET Installation
10. CONNECT ENGINE ROOM WIRE Installation
11. INSTALL AIR CLEANER CAP SUB-ASSEMBLY Installation
12. ADD ENGINE COOLANT Service and Repair
13. INSPECT FOR COOLANT LEAK Testing and Inspection
14. INSPECT FOR FUEL LEAK Fuel System
15. INSTALL OUTER COWL TOP PANEL SUB-ASSEMBLY Installation
16. INSTALL WINDSHIELD WIPER MOTOR AND LINK ASSEMBLY Installation
17. INSTALL COWL TOP VENTILATOR LOUVER SUB-ASSEMBLY Installation
18. INSTALL FRONT WIPER ARM AND BLADE ASSEMBLY RH Installation
19. INSTALL FRONT WIPER ARM AND BLADE ASSEMBLY LH Installation
20. INSTALL NO. 1 ENGINE UNDER COVER Installation
21. INSTALL ENGINE UNDER COVER ASSEMBLY Installation
22. INSTALL V-BANK COVER SUB-ASSEMBLY Installation