Operation CHARM: Car repair manuals for everyone.

Installation





2GR-FE IGNITION: IGNITION COIL AND SPARK PLUG: INSTALLATION

1. INSTALL SPARK PLUG

(a) Install the 6 spark plugs.





Torque : 18 Nm (183 kgf-cm, 13 ft-lbf)

2. INSTALL IGNITION COIL ASSEMBLY

(a) Install the 6 ignition coils with the 6 bolts.





Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)

(b) Connect the 6 ignition coil connectors.

(c) Install the 4 bolts [A].





Torque : 8.3 Nm (84 kgf-cm, 73 in-lbf)

(d) Install the nut [B].

Torque : 8.3 Nm (84 kgf-cm, 73 in-lbf)

(e) Install the 2 clamps [C].

3. INSTALL INTAKE AIR SURGE TANK ASSEMBLY Installation

4. TEMPORARILY INSTALL NO. 1 SURGE TANK STAY Installation

5. TEMPORARILY INSTALL THROTTLE BODY BRACKET Installation

6. FULLY TIGHTEN NO. 1 SURGE TANK STAY Installation

7. FULLY TIGHTEN THROTTLE BODY BRACKET Installation

8. CONNECT ENGINE ROOM MAIN WIRE Installation

9. INSTALL AIR CLEANER CAP SUB-ASSEMBLY Installation

10. INSTALL OUTER COWL TOP PANEL SUB-ASSEMBLY Installation

11. INSTALL WINDSHIELD WIPER MOTOR AND LINK ASSEMBLY Installation

12. INSTALL COWL TOP VENTILATOR LOUVER SUB-ASSEMBLY Installation

13. INSTALL FRONT WIPER ARM AND BLADE ASSEMBLY LH Installation

14. INSTALL FRONT WIPER ARM AND BLADE ASSEMBLY RH Installation

15. INSTALL V-BANK COVER SUB-ASSEMBLY Installation

16. ADD ENGINE COOLANT Service and Repair

17. INSPECT FOR ENGINE COOLANT LEAK Testing and Inspection

18. INSTALL NO. 1 ENGINE UNDER COVER Installation

19. INSTALL ENGINE UNDER COVER ASSEMBLY Installation