Removal
2GR-FE ENGINE CONTROL SYSTEM: ACTIVE CONTROL ENGINE MOUNT: REMOVAL
1. REMOVE V-BANK COVER SUB-ASSEMBLY Removal
2. REMOVE ENGINE UNDER COVER ASSEMBLY Removal
3. REMOVE NO. 1 ENGINE UNDER COVER Removal
4. DRAIN ENGINE COOLANT Service and Repair
5. REMOVE COOL AIR INTAKE DUCT SEAL Removal
6. REMOVE BATTERY Removal
7. REMOVE NO. 2 AIR CLEANER INLET Removal
8. REMOVE NO. 1 AIR CLEANER INLET Removal
9. DISCONNECT NO. 1 RADIATOR HOSE Removal
10. DISCONNECT NO. 2 RADIATOR HOSE Removal
11. DISCONNECT OIL COOLER HOSE Removal
12. DISCONNECT COOLING FAN ECU CONNECTOR Removal
13. REMOVE RADIATOR GRILLE SUB-ASSEMBLY Removal
14. REMOVE HOOD LOCK ASSEMBLY (w/o Engine Hood Courtesy Switch) Removal
15. REMOVE HOOD LOCK ASSEMBLY (w/ Engine Hood Courtesy Switch) Removal
16. REMOVE UPPER RADIATOR SUPPORT SUB-ASSEMBLY Removal
17. SEPARATE COOLER CONDENSER ASSEMBLY Removal
18. REMOVE RADIATOR ASSEMBLY AND FAN ASSEMBLY WITH MOTOR Removal
19. REMOVE TRANSVERSE ENGINE MOUNTING BRACKET
HINT
Securely support the automatic transaxle using a jack.
(a) Remove the nut, 3 bolts and the transverse engine mounting bracket.
20. REMOVE FRONT ENGINE MOUNTING INSULATOR ASSEMBLY
(a) Disconnect the vacuum hose sub-assembly from the air cleaner cap sub-assembly and vacuum switching valve.
(b) Remove the 2 clamps.
(c) Disconnect the duty vacuum switching valve connector and clamp.
(d) Remove the cap, 3 nuts and front engine mounting insulator assembly.