Removal
2GR-FXE ENGINE CONTROL SYSTEM: ECM: REMOVAL
1. REMOVE DECK BOARD ASSEMBLY Removal
2. REMOVE BATTERY SERVICE HOLE COVER ASSEMBLY Removal
3. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.
4. REMOVE ECM
(a) Disconnect the 2 ECM connectors and wire harness clamp.
(1) Push in the locks on the 2 levers, raise the levers, and disconnect the 2 ECM connectors.
NOTICE:
After disconnecting the connectors, make sure that dirt, water or other foreign matter does not contact the connecting part of the connectors.
(2) Disconnect the 3 wire harness clamps.
(3) Detach the clamp and disconnect the cooler pipe as shown in the illustration.
(4) Remove the 3 bolts and ECM with bracket.
NOTICE:
Do not deform the cooler pipe when moving it to access the bolts on the lower side.
(b) Remove the 2 bolts and wire harness bracket.
(c) Remove the 4 bolts, No. 1 ECM bracket and No. 2 ECM bracket.
(d) Detach the 3 claws and remove the engine room ECM cover and ECM.