Installation
2GR-FXE CHARGING: BATTERY: INSTALLATION
1. INSTALL AUXILIARY BATTERY
(a) Install the battery.
(b) Install the battery insulator.
(c) Connect the battery ventilation hose to the battery without kinking it.
HINT
Push in the battery ventilation hose to the battery until a click sound is heard.
(d) Install the battery clamp with the nut.
Torque : 5.4 Nm (55 kgf-cm, 48 in-lbf)
(e) Install the positive (+) battery terminal with the nut.
Torque : 6.5 Nm (66 kgf-cm, 58 in-lbf)
(f) Install the battery terminal cap.
2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.
3. INSTALL BATTERY SERVICE HOLE COVER ASSEMBLY Installation
4. INSTALL DECK BOARD ASSEMBLY Installation