Installation
1UR-FE ENGINE CONTROL: ECM: INSTALLATION
1. INSTALL GASKET
(a) Clean the ECM seal's surface with non-residue solvent.
(b) Attach a new gasket to the ECM.
2. INSTALL ECM
(a) Install the ECM with the 4 bolts.
Torque : 8.0 Nm (82 kgf-cm, 71 in-lbf)
NOTICE:
* Make sure that the gasket is not folded or caught on any area on the surrounding part.
* Make sure that there is no foreign matter caught between the gasket and surrounding part.
* Do not damage the gasket.
(b) Connect the 2 ECM connectors and push each lock lever down to lock the ECM connectors.
NOTICE:
* Make sure that the lock lever is raised 90° before connecting the ECM connectors. Failure to do this may cause the lock lever and terminals to break.
* Do not twist the wire harness when connecting the ECM connectors.
(c) Connect the wire harness clamp.
3. CONNECT CONNECTOR HOLDER BLOCK
(a) Connect the connector holder block with the 3 bolts.
Torque : 7.3 Nm (74 kgf-cm, 65 in-lbf)
(b) Install the connector holder block cover.
4. CONNECT WATER PIPE ASSEMBLY
(a) Connect the water pipe with the 2 nuts.
Torque : 5.4 Nm (55 kgf-cm, 48 in-lbf)
5. INSTALL AIR CLEANER ASSEMBLY Installation
6. INSTALL V-BANK COVER SUB-ASSEMBLY Installation