Removal
1UR-FE ENGINE CONTROL: ECM: REMOVAL
1. REMOVE V-BANK COVER SUB-ASSEMBLY Removal
2. REMOVE AIR CLEANER ASSEMBLY Removal
3. DISCONNECT WATER PIPE ASSEMBLY
(a) Remove the 2 nuts and disconnect the water pipe.
4. DISCONNECT CONNECTOR HOLDER BLOCK
(a) Remove the connector holder block cover.
(b) Remove the 3 bolts and move the connector holder block so that the ECM can be removed in the next step.
5. REMOVE ECM
(a) Disconnect the wire harness clamp.
(b) Raise the 2 levers while pushing the locks on the 2 levers shown in the illustration.
NOTICE:
Make sure that the lock lever is raised 90° as shown in the illustration before disconnecting the connectors. Failure to do this may cause the connectors to break.
(c) Disconnect the 2 connectors.
(d) Remove the 4 bolts and ECM.
6. REMOVE GASKET
(a) Peel off the rubber part of the gasket.
(b) Spray gasket remover or equivalent on the remaining tape of the gasket.
NOTICE:
When using gasket remover or equivalent, cover the ECM connector with a cloth.
(c) Remove the tape of the gasket without using bladed objects.