Installation
1UR-FE ENGINE CONTROL: IGNITION COIL AND SPARK PLUG: INSTALLATION
1. INSTALL SPARK PLUG
(a) Using a 16 mm plug wrench, install the 8 spark plugs.
Torque : 21 Nm (214 kgf-cm, 15 ft-lbf)
2. INSTALL IGNITION COIL ASSEMBLY
(a) for Bank 1:
(1) Install the 4 ignition coils with the 4 bolts.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
(2) Connect the 4 ignition coil connectors.
(3) Connect the 3 wire harness clamps.
(b) for Bank 2:
(1) Install the 4 ignition coils with the 4 bolts.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
(2) Connect the 4 ignition coil connectors and 2 wire harness clamps.
(3) Connect the water by-pass pipe with the 2 bolts.
Torque : 18 Nm (184 kgf-cm, 13 ft-lbf)
(4) Connect the engine wire harness clamp.
3. INSTALL AIR CLEANER ASSEMBLY
(a) Install the air cleaner with the 2 bolts.
Torque : 5.0 Nm (51 kgf-cm, 44 in-lbf)
(b) Tighten the hose clamp.
Torque : 4.0 Nm (41 kgf-cm, 35 in-lbf)
(c) Connect the ventilation hose and vacuum hose.
(d) Connect the MAF meter connector and clamp.
4. INSTALL V-BANK COVER SUB-ASSEMBLY Installation