Operation CHARM: Car repair manuals for everyone.

Installation





OTHER SYSTEM: VOLTAGE INVERTER: INSTALLATION

1. INSTALL VOLTAGE INVERTER ASSEMBLY





(a) Connect the 2 connectors and install the 2 wire harness clamps.

(b) Install the 6 bolts.





Torque : 7.5 Nm (76 kgf-cm, 66 in-lbf) for bolt A

Torque : 15 Nm (153 kgf-cm, 11 ft-lbf) for bolt B

2. INSTALL REAR CONSOLE BOX ASSEMBLY Installation

3. INSTALL CONSOLE UPPER REAR PANEL SUB-ASSEMBLY (for Manual Transmission on Separate Seat Type) Installation

4. INSTALL CONSOLE UPPER REAR PANEL SUB-ASSEMBLY (for Automatic Transmission on Separate Seat Type) Installation

5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Torque : 3.9 Nm (40 kgf-cm, 35 in-lbf)