Installation
A750E AUTOMATIC TRANSMISSION: PARK / NEUTRAL POSITION SWITCH: INSTALLATION
1. INSTALL PARK/NEUTRAL POSITION SWITCH ASSEMBLY
(a) Install the park/neutral position switch onto the manual valve lever shaft and provisionally tighten the adjusting bolt.
(b) Install the grommet, a new lock washer and the nut.
Torque : 6.9 Nm (70 kgf-cm, 61 in-lbf)
(c) Install the manual valve lever shaft onto the groove and turn it 2 notches counterclockwise to the neutral position.
(d) Align the neutral basic line with the switch groove and tighten the adjusting bolt.
Torque : 13 Nm (130 kgf-cm, 9 ft-lbf)
(e) Bend the tabs of the lock washer.
HINT
Bend at least 2 of the lock washer tabs.
2. CONNECT PARK/NEUTRAL POSITION SWITCH CONNECTOR
3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque : 3.9 Nm (40 kgf-cm, 35 in-lbf)
4. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY A750E Automatic Transmission
5. ADJUST PARK/NEUTRAL POSITION SWITCH ASSEMBLY A750E Automatic Transmission
6. ADJUST SHIFT LEVER POSITION A750E Automatic Transmission
7. INSPECT SHIFT LEVER POSITION A750E Automatic Transmission