Operation CHARM: Car repair manuals for everyone.

Installation





AIR CONDITIONING: AIR CONDITIONING PANEL: INSTALLATION

1. INSTALL AIR CONDITIONING CONTROL ASSEMBLY

(a) Connect the 2 connectors.





(b) Engage the 4 clips and install the air conditioning control assembly.

2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Torque : 3.9 Nm (40 kgf-cm, 35 in-lbf)

NOTICE:
Refer to PRECAUTION Service Precautions.