Operation CHARM: Car repair manuals for everyone.

Installation





1GR-FE IGNITION: IGNITION COIL AND SPARK PLUG: INSTALLATION

1. INSTALL SPARK PLUG

(a) Using a 16 mm spark plug wrench, install the 6 spark plugs.

Torque : 20 Nm (204 kgf-cm, 15 ft-lbf)

2. INSTALL IGNITION COIL ASSEMBLY

(a) Install the 6 ignition coils with the 6 bolts.

Torque : 10 Nm (102 kgf-cm, 7.4 ft-lbf)

(b) Connect the 6 ignition coil connectors.

3. CONNECT VENTILATION HOSE

4. INSTALL AIR CLEANER ASSEMBLY Installation

5. INSTALL V-BANK COVER Installation

6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Torque : 3.9 Nm (40 kgf-cm, 35 in-lbf)

7. INSPECT IGNITION TIMING Engine

8. INSPECT ENGINE IDLING SPEED Engine