Operation CHARM: Car repair manuals for everyone.

Installation





A750E AUTOMATIC TRANSMISSION: TRANSMISSION CONTROL CABLE: INSTALLATION

1. INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY





(a) Install the transmission control cable assembly with the nut.

Torque : 14 Nm (143 kgf-cm, 10 ft-lbf)

(b) Install the transmission control cable bracket and lock plate.

(c) Connect the transmission control cable with the nut to the body.





Torque : 5.5 Nm (56 kgf-cm, 49 in-lbf)

(d) Connect the transmission control cable with the 2 nuts to the body.





Torque : 5.5 Nm (56 kgf-cm, 49 in-lbf)

(e) Connect the transmission control cable with the lock plate to the floor shift assembly.





(f) Install the transmission control cable onto the floor shift assembly.

2. INSTALL VOLTAGE INVERTER ASSEMBLY (w/ Voltage Inverter) Installation

3. INSTALL CONSOLE BOX FRONT Installation

4. INSTALL INSTRUMENT PANEL CUP HOLDER TRAY Installation

5. INSTALL CONSOLE BOX ASSEMBLY REAR Installation

6. INSTALL CONSOLE UPPER REAR PANEL SUB-ASSEMBLY Installation

7. ADJUST SHIFT LEVER POSITION A750E Automatic Transmission

8. INSPECT SHIFT LEVER POSITION A750E Automatic Transmission