Installation
1GR-FE ENGINE CONTROL SYSTEM: KNOCK SENSOR: INSTALLATION
1. INSTALL KNOCK SENSOR
(a) Install the 2 sensors with the 2 bolts as shown in the illustration.
Torque : 20 Nm (204 kgf-cm, 15 ft-lbf)
Text in Illustration
(b) Connect the 2 sensor connectors.
2. INSTALL NO. 1 WATER OUTLET PIPE
(a) Install the water outlet pipe with the 2 nuts and bolt.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
(b) Attach the 3 wire harness clamps.
3. INSTALL CYLINDER HEAD SUB-ASSEMBLY (for Bank 1)
Installation