Installation
1GR-FE ENGINE CONTROL: ECM: INSTALLATION
1. INSTALL NO. 2 ECM BRACKET
(a) Install the No. 2 ECM bracket with the 2 screws.
Torque : 3.0 Nm (31 kgf-cm, 27 in-lbf)
2. INSTALL ECM BRACKET
(a) Install the bracket with the 2 screws.
Torque : 3.0 Nm (31 kgf-cm, 27 in-lbf)
3. INSTALL ECM
(a) Install the ECM with the bolt and nut.
Torque : 8.0 Nm (82 kgf-cm, 71 in-lbf)
(b) Connect the 6 connectors.
4. INSTALL LOWER INSTRUMENT PANEL SUB-ASSEMBLY
(a) Install the lower instrument panel Installation.
5. PERFORM INITIALIZATION Installation