Operation CHARM: Car repair manuals for everyone.

Installation





AIR CONDITIONING: COMPRESSOR (for 1AR-FE): INSTALLATION

1. ADJUST COMPRESSOR OIL LEVEL

(a) When replacing the cooler compressor assembly with a new one, gradually discharge the inert gas (helium) from the service valve, and drain the following amount of oil from the vents indicated by the arrows in the illustration before installation.





HINT
The drain bolt and washer can be reused.

Standard (w/o Rear Air Conditioning System):

(Oil capacity inside the new compressor assembly with pulley: 130 + 15 cc (4.4 + 0.51 fl.oz.) ) - (Remaining oil amount in the removed compressor assembly with pulley) = (Oil amount to be removed from the new compressor when replacing)

Standard (w/ Rear Air Conditioning System):

(Oil capacity inside the new compressor assembly with pulley: 225 + 15 cc (7.6 + 0.51 fl.oz.) ) - (Remaining oil amount in the removed compressor assembly with pulley) = (Oil amount to be removed from the new compressor when replacing)

NOTICE:
* If a new compressor is installed without removing some oil remaining in the pipes of the vehicle, the oil amount will be excessive. This prevents heat exchange in the refrigerant cycle and causes refrigeration system failure.
* If the volume of oil remaining in the removed compressor is too small, check for oil leaks.
* Be sure to use ND-OIL 8 or equivalent for compressor oil.

2. INSTALL COMPRESSOR ASSEMBLY WITH PULLEY

(a) Using a "TORX" socket wrench (E8), temporarily install the compressor assembly with pulley with the 2 stud bolts.





Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)

(b) Install the compressor assembly with pulley with the 2 bolts and the 2 nuts.





Torque : 25 Nm (255 kgf-cm, 18 ft-lbf)

HINT
Tighten the bolts and the nuts in the order shown in the illustration.

(c) Connect the connector.

3. INSTALL DISCHARGE HOSE SUB-ASSEMBLY

(a) Remove the attached vinyl tape from the hose.

(b) Apply sufficient compressor oil to a new O-ring and the fitting surface of the compressor assembly with pulley.

Compressor oil:

ND-OIL 8 or equivalent

(c) Install the O-ring onto the discharge hose sub-assembly.

(d) Install the discharge hose sub-assembly onto the compressor assembly with pulley with the bolt.





Torque : 9.8 Nm (100 kgf-cm, 87 in-lbf)

4. INSTALL SUCTION HOSE SUB-ASSEMBLY

(a) Remove the attached vinyl tape from the hose.

(b) Apply sufficient compressor oil to a new O-ring and the fitting surface of the compressor assembly with pulley.

Compressor oil:

ND-OIL 8 or equivalent

(c) Install the O-ring onto the suction hose sub-assembly.

(d) Install the suction hose sub-assembly onto the compressor assembly with pulley with the bolt.





Torque : 9.8 Nm (100 kgf-cm, 87 in-lbf)

5. INSTALL V-RIBBED BELT Installation

6. INSTALL FRONT FENDER APRON SEAL RH Installation

7. INSTALL FRONT FENDER LINER RH Installation

8. INSTALL FRONT FENDER MOULDING SUB-ASSEMBLY RH Installation

9. INSTALL NO. 1 ENGINE UNDER COVER

10. INSTALL FRONT WHEEL RH Installation

11. CHARGE WITH REFRIGERANT Service and Repair

12. WARM UP ENGINE Service and Repair

13. INSPECT FOR REFRIGERANT LEAK Service and Repair