Installation
OTHER SYSTEM: VOLTAGE INVERTER: INSTALLATION
1. INSTALL VOLTAGE INVERTER ASSEMBLY
(a) Install the voltage inverter assembly with the 2 bolts and nut.
Torque : 19 Nm (194 kgf-cm, 14 ft-lbf)
(b) Connect the connector.
2. INSTALL FRONT NO. 2 CONSOLE BOX INSERT Installation
3. INSTALL FRONT NO. 1 CONSOLE BOX INSERT Installation
4. INSTALL CONSOLE BOX ASSEMBLY (w/o Rear Air Conditioning System) Installation
5. INSTALL CONSOLE BOX ASSEMBLY (w/ Rear Air Conditioning System) Installation
6. INSTALL LOWER REAR CONSOLE BOX Installation
7. INSTALL NO. 2 CONSOLE BOX DUCT (w/o Rear Air Conditioning System) Installation
8. INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY Installation
9. INSTALL CENTER INSTRUMENT CLUSTER FINISH PANEL ASSEMBLY (w/o Smart Key System) Installation
10. INSTALL CENTER INSTRUMENT CLUSTER FINISH PANEL ASSEMBLY (w/ Smart Key System) Installation