Checking Ignition Switching Function
Checking ignition switching function from control unit
Requirements
Ignition coil OK
Electrical checks (wiring and component checks) OK
- Connect digital multimeter US 1119 between terminal 1 (-) and terminal 15 (+) of ignition coil
- Disconnect Hall sender (on distributor)
- Switch ignition ON
- Hold center wire of connector from distributor to ground for approx. 3 seconds
Displayed voltage must increase briefly to approx. 4.5 volts
If NO
- Replace control unit