With Manufacturer's Scan Tool
Leak Detection Pump (LDP), checking
Special tools and equipment
- Fluke 83 multimeter
- VAG 1527B voltage tester
- VW1 594 connector test kit
- Wiring diagram
Electrically checking leak detection pump
- Disconnect 3-pin harness connector of leak detection pump -V144-.
- Connect Fluke 838 multimeter to measure resistance between terminal -1- and -3- of -V144-.
Specification: 640 - 720 Ohms
- Connect Fluke 838 multimeter to measure resistance between terminals -2- and -3- of -V144-.
Specification: 17.5 - 27.5 Ohms
If the specifications are not attained:
- Replace leak detection pump -V144-.
Checking voltage supply
Test conditions
- Fuse 29 OK.
Test sequence
- Disconnect 3-pin harness connector of leak detection pump -V144-.
- Connect VAG 1527B voltage tester between connector contact 3 (positive) and engine Ground (GND).
- Start engine and run at idling speed:
LED must light up.
If the LED does not light up:
- Check wire between connector terminal -3- and relay panel for open circuit using wiring diagram