Operation CHARM: Car repair manuals for everyone.

Coolant Pump, Checking






Diagnostic Procedures

Coolant Pump, Checking

Special tools, testers and auxiliary items required

Multimeter (VAG1526) or Multimeter (VAG1715)

Connector test kit (VAG1594)

Wiring diagram

Test requirements

Fuses in E-box (plenum chamber, left) must be OK:





Motronic Engine Control Module (ECM) Power Supply Relay 2 (J670) must be OK, check:

Auxiliary Engine Coolant (EC) Pump Relay (J496), -position A° must be OK, checking:

Battery voltage must be at least 11.5 volts.

All electrical consumers such as, lights and rear window defroster must be switched off.

Ground (GND) connections between engine and chassis must be OK.

Ignition switched off.

Test sequence

- Disconnect 2-pin connector - 1 - from Coolant Pump (V36) (- 2 -).





- Connect coolant pump to the B+ and Ground (GND) terminals of the battery using the respective adapter cables.

Pump must run.

If pump does not run:

- Disconnect connection between pump and battery.

- Replace Coolant Pump (V36).

CAUTION!
The cooling system is under pressure.

Danger of scalding when opening!

- Erase DTC memory of Engine Control Module (ECM) , Diagnostic mode 4: Reset/erase diagnostic data.

- Generate readiness code.

If pump runs:

- Disconnect connection between pump and battery.

- Remove Auxiliary Engine Coolant (EC) Pump Relay (J496) from relay carrier, position A5.





Do not use metallic tools to pry off relays from relay carrier. The terminals could conduct electricity.

- Check wire between terminal 2 of relay carrier and terminal 1 of 2-pin connector of Coolant Pump (V36) for open circuit according to wiring diagram.





Wire resistance: max. 1.5 ohms

- Also check the wire for short circuit to B+ and Ground (GND).

Specified value: infinite ohms

- Check wire between 2-pin connector terminal 2 and Ground (GND) for open circuit according to wiring diagram.





Wire resistance: max. 1.5 ohms

If no malfunctions are found in wires:

- Now check voltage supply of Auxiliary Engine Coolant (EC) Pump Relay (J496).

- Connect multimeter to terminal 1 of relay carrier and Ground (GND) for voltage measurement.





- Switch ignition on.

Specified value: at least 10.0 V

- Switch ignition off.

If specified value is not obtained:

- Locate and repair open circuit using wiring diagram:

- Erase DTC memory of Engine Control Module (ECM) , Diagnostic mode 4: Reset/erase diagnostic data.

- Generate readiness code.

If specified value is obtained:

- Check wire to Engine Control Module (ECM) according to wiring diagram.

Checking wire to Engine Control Module (ECM)

- Connect test box to control module wiring harness , connect test box for wiring test.

- Check wire between test box and relay carrier for open circuit according to wiring diagram.





Terminal 5 + socket 48

Wire resistance: max. 1.5 ohms

- Check wire for short circuit to vehicle Ground (GND) and to B+.

Specified value: infinite ohms

- Erase DTC memory of Engine Control Module (ECM) , Diagnostic mode 4: Reset/erase diagnostic data.

- Generate readiness code.

If no malfunction is detected in the wire:

- Replace Motronic Engine Control Module (ECM) (J220).

Final Procedures

After the repair work, the following work steps must be performed in the following sequence:

1. Check the DTC memory. Refer to --> [ Diagnostic Mode 03 - Read DTC Memory ] Diagnostic Modes 01 - 09.

2. If necessary, erase the DTC memory. Refer to --> [ Diagnostic Mode 04 - Erase DTC Memory ] Diagnostic Modes 01 - 09.

3. If the DTC memory was erased, generate readiness code. Refer to --> [ Readiness Code ] Monitors, Trips, Drive Cycles and Readiness Codes.