Routing Tensioning Bands 4 and 5
Routing Tensioning Bands 4 and 5
• All screws are microencapsulated and must always be replaced.
• Screw tightening torque: 3.5 Nm.
• Tensioning band => [ Routing Tension Band 1 ] Routing Tension Band 1 and tensioning bads 2 and 3, refer to => [ Routing Tensioning Bands 2 and 3 ] Routing Tensioning Bands 2 and 3 are secured.
- Raise rear window frame and remove Hinge Supports (VAS 6365).
- Close hydraulic pump bypass screw and close roof.
- Carefully press tensioned headliner - 1 - and roof pillar trim - 7 - apart and secure double eye - 4 - on main hinge arm. Direction of double eye is parallel to edge of outrigger.
- Secure tensioning band - 5 - on end eye - 6 - on outside of main hinge in upper threaded connection.
- Pull tensioning band - 2 - between main hinge and water drain hose.
- Secure the end eyes - 3 - in the lower threaded connection on the outside of the main hinge.