Operation CHARM: Car repair manuals for everyone.

Roof Center Section, Installing







Roof Center Section, Installing

All screws are microencapsulated and must always be replaced.






- Place the noted number of spacer plates - 5 - at left and right on guide rail for rear threaded connection.

- Slide the roof center section - 1 - from above - arrow a - diagonally under the glass panel - 2 -.

- Place the roof center section - 1 - on the rear - arrow b - of the guide rail.

- Slide the roof center section under - arrow c - the rear window frame - 4 -.

- Align roof center section to adjacent components.






- Install front and center screws - 5 - with noted number of washers - 4 - and spacer plates - 3 -.

- Align roof center section to adjacent components.

Gap dimensions, refer to => [ Roof Center Piece Gap Dimensions ]

- Tighten front and center screws - 5 - and check gap and height dimensions.

Screw tightening torque: 9.5 Nm.






- Open the cable tie - 3 - on the guide pipes - 2 -.

- Secure the cable ties - 4 - for the electrical wires on the roof center section - 1 -.

- Remove the three bolts - 6 - for the sunroof motor - 5 -, 4.5 Nm.

- Install both screws - 7 - for the guide pipes - 2 -, 8 Nm.

- Close the glass panel using the sunroof adjustment switch.

When the luggage compartment trim is installed, make sure the support is not positioned in the opening on the longitudinal member.

To support roof, both sides of luggage compartment trim should be either removed or installed.

The bypass screw on the hydraulic pump must be opened after the repair position has been reached on vehicle from May 2007. This prevents damaging the hydraulic system.






- Open roof with convertible top operating switch until it is just before the position shown.

- Place Hinge Supports (VAS 6365) in center position - 2 -.

- Place Hinge Support (VAS 6365) in mounting hole in main hinge - 1 -.

- Switch the ignition off. The roof lowers in stages until the supports are resting on the longitudinal members.






- Install screws - 2 -.

- Close roof completely.

- Check adjustment of roof center section - 1 - to adjacent components.

- Tighten screw.

Screw tightening specification: 9.5 Nm