Operation CHARM: Car repair manuals for everyone.

Turbocharger and Coolant Return Line Assembly Overview






Turbocharger and Coolant Return Line Assembly Overview





1 Gasket

Always replace.

2 Nut, 20 Nm

Always replace.

Coat the stud bolts on the cylinder head with hot bolt paste (G 052 112 A3).

3 Banjo Bolt, 35 Nm

4 Seal

Always replace.

5 Bolt, 9 Nm

6 Bolt, 23 Nm

Only installed with the coolant return line with two brackets.

7 Coolant Return Line

Phased-in introduction of coolant return lines with one bracket.

8 Turbocharger

Can only be replaced with the exhaust manifold.

Removing and installing, refer to => [ Turbocharger ] Turbocharger.

9 Bracket

10 Bolt, 30 Nm

Coat the bolt with hot bolt paste (G 052 112 A3).

11 Bolt, 30 Nm

Coat the bolt with hot bolt paste (G 052 112 A3).

12 Bracket

13 Bolt, 23 Nm

14 Nut, 30 Nm

Do not loosen to remove the turbocharger.

Always replace.

Coat the stud bolts on the exhaust manifold with hot bolt paste (G 052 112 A3).

15 Fastening Strip