Operation CHARM: Car repair manuals for everyone.

Fuel Pressure Regulator Valve N276, Checking






Diagnostic Procedures

Fuel Pressure Regulator Valve N276, Checking

Special tools, testers and auxiliary items required

Multimeter.

Wiring diagram.

Test requirements

Fuse (SB33) OK.

The fuel filter OK.

The battery voltage at least 12.5 V.

All electrical consumers switched off (radiator fan must NOT run during test).

A/C switched off.

The fuel tank at least 1/4 filled.

The ignition switched off.

Test procedure

- Observe safety precautions. Refer to => [ Safety Precautions ] Safety Precautions

- Observe Clean Working Conditions. Refer to => [ Clean Working Conditions ] Clean Working Conditions

- Perform a preliminary check to verify the customers complaint. Refer to => [ Preliminary Check ] Preliminary Check.

Checking resistance

- Disconnect the Fuel Pressure Regulator Valve (N276) electrical harness connector - 2 -.





- Using a multimeter, check the Fuel Pressure Regulator Valve (N276) terminals 1 to 2 for resistance.





Specified value: 1 to 5 ohms (at approx. 20° C)

If the specified value was not obtained:

- Replace the Fuel Pressure Regulator Valve (N276).

If the specified value was obtained:

Checking voltage

- Start the engine.

- Using a multimeter, check the Fuel Pressure Regulator Valve (N276) electrical connector terminal 1 to ground for voltage.





Specified value: battery voltage.

- Switch the ignition off.

If the specified value was not obtained:

- Check the wiring from the Fuel Pressure Regulator Valve (N276) electrical connector terminal 1 to fuse 7 in Fuse Panel B for high resistance, a short circuit to voltage, ground, or an open circuit.

- Check the electrical harness connector for damage, corrosion, loose or broken terminals.

- If necessary, repair the wiring connection.

If no malfunctions are found in the wiring:

Checking wiring

If the manufacturers test box is being used. Perform the following step.

- Install the test box.

If the manufacturers test box is not being used. Perform the following step.

- Remove the Motronic Engine Control Module (ECM) (J623). Refer to the Repair Information.

- Using a multimeter, check the Fuel Pressure Regulator Valve (N276) electrical harness connector terminal to the Motronic Engine Control Module (ECM) (J623) electrical harness connector T60 terminal for an open circuit.









Specified value: 1.5 ohms Max.

If the specification was not obtained:

- Check the wiring for an open, high resistance or short circuit to voltage or ground.

- Check the electrical harness connector for damage, corrosion, loose or broken terminals.

- If necessary, repair the faulty wiring connection.

If no malfunction is detected in the wiring:

- Erase the DTC memory. Refer to => [ Diagnostic Mode 04 - Erase DTC Memory ] Diagnostic Modes 01 - 09.

- Perform a road test to verify repair.

If the DTC does not return:

Generate readiness code. Refer to => [ Readiness Code ] Readiness Code.

If the DTC does return, no malfunction is detected in the wiring and the voltage supply is OK:

- Replace the Motronic Engine Control Module (ECM) (J623). Refer to the Repair Information.

- Assembly is performed in the reverse of the removal.

Final procedures

After repair work, the following work steps must be performed in the mentioned sequence:

1. Check the DTC memory. Refer to => [ Diagnostic Mode 03 - Read DTC Memory ] Diagnostic Modes 01 - 09.

2. If necessary, erase the DTC memory. Refer to => [ Diagnostic Mode 04 - Erase DTC Memory ] Diagnostic Modes 01 - 09.

3. If the DTC memory was erased, generate readiness code. Refer to => [ Readiness Code ] Readiness Code.