Operation CHARM
: Car repair manuals for everyone.
Home
>>
Volkswagen
>>
2008
>>
Eos (1F7) V6-3.2L (BUB)
>>
Repair and Diagnosis
>>
Body and Frame
>>
Firewall
>>
Description and Operation
>>
Materials
Materials
Materials
*
Pay attention to the minimum curing time: the minimum curing time for the bulkhead with 1K adhesive DH 009 100 is 180 minutes.
*
Heat according to manufacturer instructions using cartridge heater (V.A.G 1939).