Firewall: Service and Repair
Bulkhead Assembly Overview
• The bulkhead - 1 - is bolted and also bonded in with PUR adhesive sealing material - 3 -.
1 Bulkhead
• Removing:
• Separate the bulkhead with workshop equipment after removing the bolts - 2 -.
2 Bolt
• Quantity: 10
• Tightening specification: 25 Nm
3 PUR adhesive sealant
• DH 009 100 03
• Bead diameter: width = 8 mm, height = 10 mm
• Pay attention to the minimum curing time: the minimum curing time for the bulkhead with 1K adhesive DH 009 100 is 180 minutes.