Secondary Air Injection Pump Motor Checking







Secondary Air Injection Pump Motor Checking

Special tools, testers and auxiliary items required

Multimeter.

Wiring diagram.

Test requirements

The Secondary Air Injection (AIR) Pump Relay (J299) fuses OK.

The Power Supply Relay (terminal 30, B+) (J317) fuse OK.

Battery voltage at least 12.5 V.

All electrical consumers switched off (radiator fan must NOT run during test).

A/C switched off.

The ignition switched off.

Test procedure

- Perform a preliminary check to verify the customers complaint. Refer to => [ Preliminary Check ] Preliminary Check.

Start diagnosis

- Remove the center noise insulation fasteners - 1, 2, 3 - and the center noise insulation panel.





- Disconnect the Secondary Air Injection (AIR) Pump Motor (V101) electrical harness connector - 3 -.





Checking voltage

- Start engine momentarily.

- Using a multimeter, check the Secondary Air Injection (AIR) Pump Motor (V101) electrical harness connector terminal 2 to Ground.





Specified value: Battery voltage.

If the specified value was Not obtained:

- Check the wiring connection from the Secondary Air Injection (AIR) Pump Relay (J299) socket 2/87 to the Secondary Air Injection (AIR) Pump Motor (V101) electrical harness connector terminal 2 for an open circuit, high resistance, or short circuit to each other, Battery (+) or Ground.

- Check the wiring connections for damage, corrosion, loose or broken terminals.

- If necessary, repair the faulty wiring connection.

If the specified value was obtained:

Checking Ground

- Using a multimeter, check the Secondary Air Injection (AIR) Pump Motor (V101) electrical harness connector terminal 1 to Ground connection on left headlamp for resistance.





Specified value: 1.5 ohms Max.

If the specification was Not obtained:

- Check the wiring for a short circuit to each other, high resistance, short to Battery (+) or Ground.

- Check the electrical harness connector for damage, corrosion, loose or broken terminals.

- If necessary, repair the faulty wiring connection.

If no malfunction is found in the wiring and voltage supply was OK:

- Replace Secondary Air Injection (AIR) Pump Motor (V101).

- Assembly is performed in the reverse of the removal.

Final procedures

After repair work, the following work steps must be performed in the following sequence:

1. Check the DTC memory. Refer to => [ Diagnostic Mode 03 - Read DTC Memory ] Diagnostic Modes 01 - 09.

2. If necessary, erase the DTC memory. Refer to => [ Diagnostic Mode 04 - Erase DTC Memory ] Diagnostic Modes 01 - 09.

3. If the DTC memory was erased, generate readiness code. Refer to => [ Readiness Code ] Monitors, Trips, Drive Cycles and Readiness Codes.