Overview of Ground Connections, from July 2005
Ground Connections
Overview of Ground Connections, from July 2005
(602) - Ground Connection (in front left footwell)
• Torque Settings: 9Nm
(605) - Ground Connection (on upper steering column)
• Torque Settings: 9Nm
(638) - Ground Connection for Access/Start Control Module
• Torque Settings: 9Nm
(43) - Ground Connection (on right lower A-pillar) => -Arrow C-
(47) - Ground Connection (in front right footwell) => -Arrow B-
(638) - Ground Connection (on right A-pillar) => -Arrow A-
(44) - Ground Connection (on left lower A-pillar) => -Arrow B-
(602) - Ground Connection (in front left footwell) => -Arrow A-
(45) - Ground Connection (behind instrument panel, center) => -Arrow-
(77) - Ground Connection (on left lower B-pillar) => -Arrow-
(78) - Ground Connection (on right lower B-pillar) => -Arrow-
(605) - Ground Connection (on upper steering column) => -Arrow-