General Information
General Information
• Charge air system must be properly sealed.
• Always replace self-locking nuts.
• Charge air hoses and pipes as well as their connections must be free of oil and grease before reinstalling.
• Do not assemble charge air hoses and lines with lubricants containing oils, only coat with water (without additives) if necessary.
• Note installation marks on hoses and components.
• All hose connections for charge air system are secured by spring-type clamps or by connector couplings.
• Install only approved clamps for securing hose connections
• Pliers for spring clamps or Hose clamp pliers are recommended for installing spring clamps.
• For connector couplings, always note the following points:
- Disengage connector coupling by pulling securing clip - arrow -.
- Disconnect hose and pipe without the assistance of tools.
- When assembling, make sure the retaining tabs - A - are engaged securely.
• Before screwing on oil supply line, fill turbocharger with engine oil at filler tube.
• After installing turbocharger, let engine idle for approx. 1 minute without increasing engine speed. This ensures adequate oil supply to the turbocharger.