Operation CHARM: Car repair manuals for everyone.

Intercooler: Description and Operation



General Information

- Charge air system must be properly sealed.
- Always replace self-locking nuts.
- Charge air hoses and pipes as well as their connections must be free of oil and grease before reinstallation.
- Do not assemble charge air hoses and pipes with lubricants containing oils, only coat with water (without additives) if necessary.
- Note installation marks on hoses and components.
- All hose connections for charge air system are secured by spring-type clamps or by connector couplings.
- Install only approved clamps for securing hose connections.
- Spring Type Clip Pliers or Hose clamp pliers are recommended for installing spring clamps.
- For connector couplings, always note the following points:







- Release connector coupling by pulling securing clip - arrow -.
- Disconnect the hose and line without the assistance of tools.
- When assembling, make sure the retaining tabs - A - are engaged securely.