Engine, Installing
Engine, Installing
When doing any repair work, especially in the engine compartment, pay attention to the following due to clearance issues:
• Route lines of all types (for example, fuel, hydraulic, Evaporative Emission (EVAP), coolant, refrigerant, brake fluid and vacuum) and electrical wiring so that the original path is followed.
• To prevent damage to the lines, make sure there is sufficient clearance to all moving or hot components.
Installation is performed in reverse order. When doing this note the following:
- Make sure the centering sleeves for the engine to transmission are installed in the cylinder block. Install if necessary.
- Reconnect all lines, hoses and connections that were disconnected for the removal sequence.
- Electrical connections and routing.
- Connect the Air Conditioning (A/C) lines.
- Top off the fluid level for the power steering. Refer to Fluid Capacity Tables Rep. Gr. 03.
- Fill the coolant. Refer to => [ Draining and Filling ] Draining and Filling.
- Check the headlamp adjustment, correct if necessary. Refer to Maintenance Procedures Rep. Gr. 03 Maintenance Procedures.
- Perform a test drive and check all Diagnostic Trouble Code (DTC) memories. Refer to "Guided Fault Finding" in the vehicle diagnosis, testing and information system VAS 5051 or VAS 5052.
Tightening Specifications