Operation CHARM: Car repair manuals for everyone.

Minimum Curing Time







Minimum Curing Time

Minimum curing time for a newly bonded extension is 3 hours.

Minimum curing time is the time from applying the components up to vehicle use.

Wait two hours after bonding with two-sided adhesive tape before performing other work on the vehicle.

During the time, the vehicle must be standing on an even surface and the temperature in the room must be 18?.

CAUTION!
The vehicle is operationally ready only after the minimum curing time has elapsed.