New Roof Pillar Trim, Preparing
New Roof Pillar Trim, Preparing
• The tensioning bands are packaged with the original component. The tensioning straps must be adapted on vehicles from October 2007.
- Guide the tensioning bands - 1 and 2 - through the eyes on the trim - 1 -.
Only vehicles from October 2007
- The tensioning band - 1 - has a white marking and is cut off there - arrow a -.
All vehicles
- Position the seal - 4 - 15 mm - dimension c - from the end of the tensioning bands.