Operation CHARM: Car repair manuals for everyone.

New Roof Pillar Trim, Preparing







New Roof Pillar Trim, Preparing

The tensioning bands are packaged with the original component. The tensioning straps must be adapted on vehicles from October 2007.






- Guide the tensioning bands - 1 and 2 - through the eyes on the trim - 1 -.

Only vehicles from October 2007

- The tensioning band - 1 - has a white marking and is cut off there - arrow a -.

All vehicles

- Position the seal - 4 - 15 mm - dimension c - from the end of the tensioning bands.