Emission Control Systems: Specifications
Fastener Tightening Specifications
• 1 Always replace
Secondary Air Injection (AIR) Connecting Pipe Bolt Tightening Sequence and Specification
- Install the bolts - 1 through 3 - hand tight.
- Tighten the bolts - 1 through 3 - in sequence to 10 Nm.