Operation CHARM: Car repair manuals for everyone.

Emission Control Systems: Specifications






Fastener Tightening Specifications





1 Always replace

Secondary Air Injection (AIR) Connecting Pipe Bolt Tightening Sequence and Specification





- Install the bolts - 1 through 3 - hand tight.

- Tighten the bolts - 1 through 3 - in sequence to 10 Nm.