Subframe Front Bonded Rubber Bushing
Subframe Front Bonded Rubber Bushing
Special tools, testers and auxiliary items required
• Supporting ring (T10301/8)
• Press piece (T10301/5)
• Tube (T10301/3)
• Spacer (T10301/9)
• Hydraulic Press (VAS 6178) with Pressure Head (T10205/13)
• Nut (T10301/2)
• Spindle (T10301/1)
• Thrust pad (T10301/10)
• Spacer (T10301/11)
Pressing Out
- Attach (T10301/8) so that narrow side - arrow - faces subframe.
• (T10301/8) must be able to be attached easily and must not be canted.
- Install tools as shown in the illustration.
1. (T10301/5)
2. (T10301/8)
3. (T10301/3)
4. (T10301/9)
5. (VAS 6178) with (T10205/13)
6. (T10301/2)
7. (T10301/1)
- Press out bonded rubber bushing.
Secure (VAS 6178) while pressing out.
Installation Position
One of the arrows - 1 - must point in direction of travel
Pressing In
- Attach (T10301/10) with open side to subframe.
When pressing in bonded rubber bushing, make sure that (T10301/10) is in correct position to prevent subframe from damage.
- Install tools as shown in the illustration.
1. (T10301/7)
2. Bonded rubber bushing
3. (T10301/10)
4. (T10301/11)
5. (VAS 6178) with (T10205/13)
6. (T10301/2)
7. (T10301/1)
- Press in bonded rubber bushing until shoulder lies gap-free at subframe sleeve.
- Mount subframe to body. Refer to => [ Mount subframe on body and remove (second mechanic required). ] Overhaul.