Turbocharger
Turbocharger
• Secure all hose connections using hose clamps appropriate for the model type.
• Hose connections and charge air system hoses must be free of oil and grease before installing. Sealing ring and sealing surfaces must only be lightly oiled with connector couplings => [ Hose Connections with Connector Couplings, Assembling ] Hose Connections With Connector Couplings, Assembling.
• Charge air system must be properly sealed.
• Replace self-locking nuts.
• Pliers for spring clamps (VAS 6362) or Hose clamp pliers (V.A.G 1921) are recommended for installing spring clamps.
• Add oil to turbocharger through oil feed line connecting piece.
• After installing turbocharger, let engine idle for approximately 1 minute without increasing engine speed. This ensures adequate oil supply to the turbocharger.
• Observe the rules for cleanliness => [ Clean Working Conditions ] Fuel Supply System.
Assembly overview, turbocharger => [ Turbocharger, Assembly Overview ] Turbocharger, Assembly Overview.
Assembly of hose connections with connection couplings => [ Hose Connections with Connector Couplings, Assembling ] Hose Connections With Connector Couplings, Assembling.
Removing and installing turbocharger => [ Turbocharger, Removing and Installing ] [1][2]Turbocharger.
Exhaust turbocharger vacuum diaphragm, checking => [ Turbocharger Vacuum Diaphragm, Checking ] Turbocharger Vacuum Diaphragm, Checking.
Turbocharger Vacuum Diaphragm, Removing and Installing => [ Turbocharger Vacuum Diaphragm, Removing and Installing ] Service and Repair.
Turbocharger Vacuum Diaphragm, Engine Code BZB and CGYA, Adjusting.